Studio notes

How we run a five-day design sprint

Our slightly unusual sprint recipe, including the snacks.
Six colourful sticky notes arranged on a lilac wall

We run a sprint at the start of almost every project. It is the fastest way to get everyone in one room, agree on the problem and leave with something real to test.

The recipe

  1. Monday: map the problem, pick one target.
  2. Tuesday: everyone sketches, alone and together.
  3. Wednesday: decide, with stickers and no long speeches.
  4. Thursday: build a realistic prototype.
  5. Friday: test with five real people.

The most important rule: no laptops on Monday and Tuesday. The second most important rule: good snacks. Hungry people defend bad ideas.

By Friday we had changed our minds three times, and every change was the right one.

A client, after their first sprint