When Westfield's old primary school failed its structural survey, the district had fourteen months to replace it before the new school year. A traditional design-bid-build process would have taken that long just to reach the start of construction.
Why design-build worked
- The architect, engineer and builder sat at one table from week one.
- Steel was ordered while the interior layout was still being finalised.
- The district made decisions in weekly two-hour workshops, not monthly meetings.

The school opened on schedule, under budget, with a gym that doubles as a community hall in the evenings.
Design-build is not right for every project, but when time is the hardest constraint, it is usually the fastest honest route.
